West View BodrumSpecifications Project Name:West View BodrumLocation:BodrumStart Date:Completion Date: MESE Construction is one of the main top construction builders within .
We can construct your personal build with your input, specific style and design all being a major part of your dream home. You will speak and discuss your ideas with the President and Founder of Mikenden Construction Company Mr.Mete Telyakar.
The valued input of your own creative design internal and external will be of course benefical to both you our client and our company for future reference.
Properties will be half stone clatting.
Properties will have water and heat proof.
Outside walls will be plastered with water proof paint.
The garden is going to be landscaped.
Kitchen units and the bathroom units will be fitted.
White goods are included in the price ; waching machine , cooker , oven and extractor fan , 2 A/C.
Kitchen units will be MDF.
Bathroom units include sink , tap , wc ,shower and shower cubicle.
Floors will be tiled.
Bathroom wall and floor will be tiled.
Terrace is going to be tiled.
Central heating system will be installed (pipes only). Radiators and boiler not included. Liquid gas will be used.
Inside walls will be painted.
Interior doors will be American press doors.
Balcony doors and windows will be a brown color PVC (double glazed)
There will be half pergole fitted on the terrace as it is in the project.
The entrance steps to the properties are going to be traverten.
A 15 cm thick brick will be used for the outside walls, and a 10 cm thick brick for inside walls.
2 plugs and 1 lighting switch for each bedroom
Satalite wiring , telephone wiring , and tv wiring system will be installed in living room
2 plugs and 2 switches in the kitchen
Ceiling lighting will be fitted on terrace.
T.S.E approved materials will be used for water and electricity system.
The garden walls will going be stone
There will not be a sewage system per property, instaed there will be a communal sewage tank
A communal water tank for all the properties.
The water is not local , it is going to be from a natural well. Therefore, there will be no water cuts and no water payments.
A communal pool for the 10 properties.
The foundations are water proof based.
|
Own Developments
 | Altinkum Apartments
Will be completed on Summer'06
located in Altinkum/Didim/Turkey
Prices starting from 32200GBP
more >>
|  | Sapphire Beach Village
Will be completed on Summer'06
located in Yesilkent/Didim/Turkey
Prices starting from 23000GBP
more >>
|  | Sapphire Apartment
Will be completed on July'06
located in Altinkum
Prices starting from 35000GBP
more >>
|  | Diamond City-II
Will be completed on August 2006
located in Altinkum
Prices starting from 39000GBP
more >>
|  | West View Bodrum
Will be completed on
located in Bodrum
more >>
|  | Bertan-II
Will be completed on July 2006
located in Altinkum
Prices starting from 37600GBP
more >>
|  | Sultan Hanim
Will be completed on June 2006
located in Altinkum
Prices starting from 53700GBP
more >>
|  | Sun Village
Will be completed on June 2007
located in Altinkum
Prices starting from 20400GBP
more >>
|  | Diamond City-I
Will be completed on Completed
located in Altinkum
Prices starting from 63700GBP
more >>
|
Office Hours
Winter 1st Nov-20th Apr |
Summer 21st Apr-31st Oct |
09:00am-05:00pm (GMT+2) Sat & Sun Off |
09:30am-10:00pm (GMT+2) No off day |
|